Posted on: May 22, 2017

TOWNSHIP WIDE STORMWATER STUDY, BY CH2M

Township Wide Stormwater Study, by CH2M

The following are the end result of the Township Wide Stormwater Study by CH2M, commissioned in 2016. In the next 2-3 weeks, additional back up data will be provided by CH2M, and posted to the website.

The information...

Read on...

Engineering
Posted on: May 15, 2015

North Wayne Field Basin Proposed Planting Plan

Prepared by Chagrin Valley Engineering, LTD. January 2015

Click Here To View The Plans Engineering
Posted on: August 24, 2015

Ithan Creek Watershed Assessment - Task 2

Identification of Potential Solutions

Assessment Information Engineering
Posted on: July 27, 2015

CH2M Ithan Creek Flooding Analysis

Ithan Creek Flooding Analysis power point presentation given by Dan Wible of CH2M to the Stormwater Management Advisory Committee at the June 11, 2015 meeting.

Additional Info... Engineering
Posted on: May 15, 2015

North Wayne Field Basin Plans

North Wayne

Prepared by Chagrin Valley Engineering, LTD. January 2015

Click Here To View The Plans Engineering